Concrete Labor Cost Calculator
Estimate labor-only costs for a concrete slab, driveway, patio or sidewalk in US dollars.
- $0per sq ft
- 0sq ft
- 0crew days
- 0cubic yards (+10%)
| Task | Hours | Cost |
|---|---|---|
| Overhead & profit | $0 | |
| Total labor | 0 | $0 |
Labor only. Concrete, rebar, forms, pump, haul-off and permits are not included. Estimates are for planning; get written quotes from local contractors.
How this estimate works
The calculator multiplies typical labor hours for each task (grading, forming, reinforcement, placing, finishing, curing and optional demolition) by your hourly rate, then adjusts for local cost level and job difficulty. Contractor overhead and profit are added last. The range shows ±15% to reflect real-world bids.
Concrete Labor Cost: Visual Guide
See where labor dollars go on a US concrete slab, from site prep to sealing.
Where the labor hours go
Typical split for a 20 × 20 ft, 5-inch broom-finish driveway with wire mesh (about 42 labor hours).
- Site prep & grading14%
- Forming edges19%
- Reinforcement10%
- Placing & screeding24%
- Finishing28%
- Curing & sealing5%
The labor process, step by step
Select a step to see what the crew does and what drives its cost.
Site prep & grading ~14% of hours
The crew clears the area, grades it and compacts a gravel base. Aim for a slope of about 1/8 to 1/4 inch per foot so water drains away.
Cost driver: heavy grading or excavation can nearly triple this step.
Forming edges ~19% of hours
Wood or steel forms are set to line and grade and held with stakes. They shape the slab edges.
Cost driver: forming scales with perimeter and curves, not area, so small slabs cost more per sq ft.
Reinforcement ~10% of hours
Wire mesh or rebar is set on chairs so it sits near the middle of the slab.
Cost driver: a rebar grid takes about 2.5 times the labor of wire mesh.
Placing & screeding ~24% of hours
Concrete is discharged from the truck or pump, spread and leveled with a screed. This is time-critical because the mix starts to set.
Cost driver: thicker slabs and poor truck access (wheelbarrow work) add hours.
Finishing ~28% of hours
The crew floats, trowels or brooms the surface, then edges it and cuts control joints.
Cost driver: stamped or decorative finishes take about 5 times the labor of a broom finish.
Curing & sealing ~5% of hours
A curing compound or moisture cover keeps the slab from drying too fast. Light foot traffic is usually fine after 24 to 48 hours; vehicles after about 7 days.
Cost driver: sealing and weather protection add small but real time.
Slab cross-section: what the crew builds
Each layer is a labor task. Thicker slabs and more layers mean more hours.
- Slab: placing, screeding and finishing labor. Driveways and garages use 5 to 6 in.
- Reinforcement: mesh or rebar on chairs, placed before the pour.
- Forms & stakes: set along the perimeter, removed after the slab sets.
- Gravel base: spread and compacted during site prep.
Labor-only cost per sq ft by finish
Typical range at $45/hr crew rate, average US metro, with 20% overhead & profit.
How your location changes the price
Example: the same broom-finish driveway (about $5.67 per sq ft in an average metro).
What raises or lowers labor cost
Raises cost
- Stamped or decorative finish
- Rebar grid instead of mesh
- Heavy grading or excavation
- Slopes, curves and tight access
- Old slab removal and haul-off
- High-cost metro area
Lowers cost
- Simple rectangular shape
- Level site with good truck access
- Broom finish
- Larger jobs that spread fixed costs
- Off-peak scheduling
- Comparing 3 written quotes
Figures are planning estimates based on typical US labor rates and productivity. They cover labor only; concrete, rebar, forms, pump, haul-off and permits are extra. Get written quotes from local contractors. Use the calculator on this page for your own numbers.