How do I calculate cubic yards of concrete for a slab?

Multiply length × width (in feet) × thickness (in feet) to get cubic feet, then divide by 27. A 4-inch slab is 0.333 ft thick.

How thick should a concrete slab be?

4 inches is common for patios and walkways, 5–6 inches for garage floors and driveways, and thicker for heavy loads. Check local building code.

How many 80 lb bags make one cubic yard?

One cubic yard is 27 cubic feet. An 80 lb bag yields about 0.60 cubic feet, so you need roughly 45 bags per cubic yard.

Concrete Slab Diagram Guide

Visual reference for residential slabs in the US: layers, thickness, joints, reinforcement, drainage and the pour-to-cure timeline. Dimensions are in feet and inches.

1. Slab cross-section: what goes under and inside

Tap a number or a layer to highlight it in the diagram.

Concrete slab cross-section From bottom to top: compacted subgrade, gravel base, vapor barrier, reinforced concrete slab with a control joint, and an isolation joint at the wall. Wall 4 in. slab 1 2 3 4 5 6 7
Not to scale. Typical residential slab-on-grade.

2. Slab thickness by project

  • Walkway or patio4 in.
  • Shed base4–5 in.
  • Garage floor4–6 in.
  • Driveway (cars and light trucks)4–6 in.
  • RV pad or heavy loads6–8 in.

Dark bar = typical minimum; light bar = upper range for heavier use. Heavy loads: ask an engineer.

Thickness explorer

Slab edge drawn at the selected thickness 4 in. gravel base
Edge view scaled to the selected thickness.
Typical use
1 cubic yard covers
Control joint spacing (2–3 × thickness)

3. Control and isolation joint layout

Plan view of a 20 by 20 foot patio with joints A 20 by 20 foot patio attached to a house, divided by control joints every 10 feet into four square panels, with an isolation joint along the house wall. House wall 10 × 10 ft10 × 10 ft10 × 10 ft10 × 10 ft 20 ft
  • Control joint
  • Isolation joint
  • Spacing rule: joint spacing in feet ≈ slab thickness in inches × 2 to 3. A 4 in. slab: every 8–12 ft.
  • Keep panels square. Length should not exceed about 1.5 × width. Avoid long, narrow or L-shaped panels.
  • Depth: at least ¼ of the slab thickness.
  • Timing: tool joints while wet, or saw-cut the same day or next morning once the surface won’t ravel.
  • Add joints at inside corners and where the slab narrows, since cracks start there.
  • Isolation strip along the house, steps, posts and drains.

4. Rebar grid layout

Plan view of a rebar grid at 18 inches on center Rebar bars run both ways at 18 inch spacing, tied at crossings, held about 3 inches in from the slab edges. 18 in.
  • Rebar
  • 3 in. edge cover
  • Common choices: #3 rebar at 18 in. on center, #4 at 24 in., or 6×6 welded wire mesh. Follow local code or an engineer for loaded slabs.
  • Support it. Set bars on chairs or dobies so they sit in the middle to upper part of the slab, never on the dirt.
  • Edge cover: keep steel about 3 in. from the forms and edges.
  • Overlap and tie: lap bar ends (about 20 in. for #4) and tie with wire at crossings.
  • Mesh: pull it up into the concrete during the pour; if it stays on the ground it does nothing.

5. Drainage slope and forms

Slab sloping away from a house Side view of a slab that drops about a quarter inch per foot away from the house wall, with a staked form board at the far edge. House Slope ≈ ¼ in. per foot Form + stake
Slope exaggerated for clarity.
  • Slope: ⅛–¼ in. per foot, always away from the house. A 12 ft patio drops 1½–3 in.
  • Forms: straight 2×4 (3½ in.) or 2×6 (5½ in.) boards, staked every 2–4 ft and braced at corners.
  • Excavation depth = slab thickness + base thickness. A 4 in. slab on a 4 in. base needs about 8 in.
  • Check with a string line and a level or slope gauge before the truck arrives.

6. Pour day: step by step

  1. Plan and call 811Check permits, setbacks and HOA rules. Call 811 a few business days before you dig to mark buried utilities.
  2. ExcavateDig to slab thickness plus base thickness, with a little extra at the edges for forms.
  3. Compact and add baseCompact the subgrade, then spread and compact about 4 in. of crushed stone.
  4. Set formsStake boards to the finished height with the right slope. Oil or spray the inside faces.
  5. Barrier and reinforcementLay poly where needed, then set rebar or mesh on chairs.
  6. Pour and screedStart at the far end, spread with a rake, and strike off with a straight 2×4.
  7. Float, edge and finishBull float, wait for bleed water to disappear, then edge, groove joints and broom finish.
  8. CureKeep the surface damp or covered for 7 days. Saw-cut joints on schedule.

7. Curing timeline and quick facts

  • 24–48 hoursLight foot traffic. Keep pets, bikes and wheelbarrows off.
  • About 7 daysFurniture and light vehicles. Most of the strength is gained.
  • 28 daysFull design strength. Heavy loads and sealers.
  • 3,000 psiMinimum for walks and patios. Use 3,500–4,000 psi for garages and driveways.
  • 5–7% airAir-entrained concrete resists freeze-thaw and de-icing salts.
  • 40–90°FNormal pour range. Colder or hotter weather needs precautions.
  • No added waterExtra water weakens concrete and promotes cracking and dusting.

General guidance for typical residential slabs, not engineering advice. Requirements vary by climate, soil and local building code, so confirm with your local building department or a licensed professional. Use the Concrete Slab Calculator on this page to estimate cubic yards and bags.