Concrete Volume Calculator

Concrete Volume Calculator

Find out how many cubic yards of concrete you need for a slab, footing, wall or round column.

Shape
Driveway/patio slabs are typically 4 in.
Number of identical pieces.
5–10% covers spillage and uneven grade.
How is it calculated?

Slab, wall or footing: length × width × thickness. Round column or slab: π × (diameter ÷ 2)² × height. Cubic feet ÷ 27 = cubic yards. Bag yields: 80 lb = 0.60 cu ft, 60 lb = 0.45 cu ft, 40 lb = 0.30 cu ft. Weight assumes 150 lb per cubic foot.

Concrete Volume Diagram Guide

See how concrete is measured, which dimensions to take, and how to turn them into cubic yards, the unit US suppliers sell by.

One cubic yard of concrete A cube measuring 3 feet wide, 3 feet deep and 3 feet tall, divided into 27 one-foot cubes. 3 ft 3 ft 3 ft
1 cubic yard = 3 ft × 3 ft × 3 ft

What is a cubic yard?

Ready-mix trucks and most US suppliers sell concrete by the cubic yard (yd³).

1 yd³ = 27 ft³Cubic feet ÷ 27 = cubic yards

Think of 27 one-foot cubes stacked in a 3 × 3 × 3 block.

Slabs, footings and walls

Patios, driveways, footings and walls are all boxes. Measure three sides and multiply.

Rectangular slab dimensions A flat rectangular slab with its length, width and thickness marked. Length (L) Thickness (T) Width (W)
Measure length and width in feet. Thickness is usually in inches.
Volume (ft³) = L (ft) × W (ft) × T (ft)Convert inches to feet first: inches ÷ 12
Round column dimensions A cylinder with its diameter across the top and its height along the side. Diameter (D) Height (H)
Sonotube columns, piers and round slabs

Round columns and piers

Measure across the full width of the circle (diameter) and the height or depth.

Volume = π × (D ÷ 2)² × Hπ ≈ 3.1416. Use feet for D and H.

How to calculate it, step by step

  1. MeasureTake length, width and thickness (or diameter and height).
  2. Convert to feetDivide inches by 12. A 4 in slab is 0.333 ft thick.
  3. MultiplyThis gives cubic feet.
  4. Divide by 27This gives cubic yards.
  5. Add 5–10% extraCovers spillage, uneven ground and over-excavation.
Example: a 20 ft × 10 ft patio, 4 in thick.
20 × 10 × 0.333 = 66.67 ft³ → ÷ 27 = 2.47 yd³ → +10% = 2.72 yd³ to order.

How far does 1 cubic yard go?

Thicker slabs use more concrete. Area covered by one cubic yard, before waste:

  • 4 in
    81 sq ft
  • 5 in
    64.8 sq ft
  • 6 in
    54 sq ft
  • 8 in
    40.5 sq ft
  • 12 in
    27 sq ft

Common 4 inch slab sizes

Cubic yards, rounded to 2 decimals.
Slab sizeAreaExact yd³With 10% extra
10 × 10 ft100 sq ft1.231.36
12 × 12 ft144 sq ft1.781.96
10 × 20 ft200 sq ft2.472.72
16 × 16 ft256 sq ft3.163.48
20 × 20 ft400 sq ft4.945.43
24 × 24 ft576 sq ft7.117.82

Bags needed for 1 cubic yard

Pre-mixed bags suit small jobs. Larger pours are usually cheaper and easier with a ready-mix truck.

4580 lb bags (0.60 ft³ each)
6060 lb bags (0.45 ft³ each)
9040 lb bags (0.30 ft³ each)

Bag yields vary by brand. Check the label on your bags.

Before you order

  • Always add 5–10% extra. Running short mid-pour is costly.
  • Measure the finished thickness, then add depth for any uneven ground.
  • For several pours (footings plus slab), add the volumes together before ordering.
  • Ask your supplier about minimum loads and short-load fees.

Concrete Volume Calculator

Know exactly how much concrete to order for your slab, footing, wall, or column.

Use this concrete volume calculator to find how many cubic yards of concrete your project needs. Enter your dimensions, add a waste allowance, and get a total you can give straight to your ready-mix supplier or turn into a bag count. It handles rectangular pours like patios and footings, plus round pours like sonotube columns.

How to Use the Concrete Volume Calculator

Pick the mode that matches the shape of your pour. Use the unit selector next to each measurement to switch between feet (ft) and inches (in), so you can enter numbers exactly as you measured them.

Slab / Wall / Footing (Rectangular)

  1. Enter the Length of the pour. For a footing, use the total run of the trench.
  2. Enter the Width. For a wall, enter the wall’s height here.
  3. Enter the Thickness / Depth. This is the slab thickness, footing depth, or wall thickness. Driveway and patio slabs are typically 4 in.
  4. Set Quantity to the number of identical pieces, such as three matching pads.
  5. Set Waste / extra (%). The default is 10%.
  6. Click Calculate. Use Reset to start over.

Round Column / Slab (Cylindrical)

  1. Enter the Diameter: the full inside width of the form or hole, not the radius.
  2. Enter the Height / Depth of the column, pier, or round slab.
  3. Set Quantity to the number of identical columns or holes.
  4. Set Waste / extra (%).
  5. Click Calculate.

How Concrete Volume Is Calculated

Rectangular Slabs, Walls, and Footings

Volume (yd³) = Length (ft) × Width (ft) × (Thickness in ÷ 12) ÷ 27

You measure thickness in inches but length and width in feet. Dividing by 12 turns inches into feet, so all three numbers match. Multiplying them gives cubic feet.

A cubic yard is a cube 3 ft on each side, which holds 3 × 3 × 3 = 27 cubic feet. Ready-mix concrete is sold by the cubic yard, so dividing by 27 gives you the number your supplier needs.

Round Columns and Slabs

Volume (ft³) = π × (Diameter ÷ 2)² × Height

Then divide by 27 for cubic yards. Pi (π) is about 3.1416. Diameter ÷ 2 is the radius.

A common mistake is plugging the diameter in where the radius belongs. Because the radius gets squared, that error makes your answer four times too big.

How Quantity and Waste Are Applied

The calculator multiplies one piece by your quantity, then adds the waste percentage:

Total = Volume of one piece × Quantity × (1 + Waste % ÷ 100)

At 10% waste, that means multiplying by 1.10.

Worked Examples

Example 1: 20 ft × 10 ft Patio Slab, 4 in Thick, 10% Waste

  1. Convert thickness to feet: 4 ÷ 12 = 0.333 ft
  2. Find cubic feet: 20 × 10 × 0.333 = 66.67 ft³
  3. Convert to cubic yards: 66.67 ÷ 27 = 2.47 yd³
  4. Add 10% waste: 2.47 × 1.10 = 2.72 yd³ (73.3 ft³, about 2.08 m³)

What to order: 2.75 cubic yards of ready-mix.

Example 2: Continuous Footing for a 16 × 16 ft Garage

The footing is 20 in wide and 10 in deep. Its centerline runs 64 ft around the building. Measure along the centerline; adding up the outside edges double-counts the corners.

  1. Convert width: 20 ÷ 12 = 1.667 ft
  2. Convert depth: 10 ÷ 12 = 0.833 ft
  3. Find the cross-section: 1.667 × 0.833 = 1.389 ft²
  4. Find cubic feet: 64 × 1.389 = 88.9 ft³
  5. Convert to cubic yards: 88.9 ÷ 27 = 3.29 yd³
  6. Add 10% waste: 3.29 × 1.10 = 3.62 yd³ (97.8 ft³, about 2.77 m³)

What to order: 3.75 yd³. If the trench was dug by hand or the soil is rocky, bump that to 4 yd³. In the calculator, enter Length 64 ft, Width 20 in, and Depth 10 in.

Example 3: Four Round Columns, 12 in Diameter, 4 ft Deep

  1. Find the radius: 12 in ÷ 2 = 6 in = 0.5 ft
  2. Find the area: 3.1416 × 0.5² = 0.785 ft²
  3. Volume of one column: 0.785 × 4 = 3.14 ft³
  4. Volume of four columns: 3.14 × 4 = 12.57 ft³
  5. Add 10% waste: 12.57 × 1.10 = 13.82 ft³
  6. Convert to cubic yards: 13.82 ÷ 27 = 0.51 yd³ (about 0.39 m³)

What to order: 13.82 ÷ 0.60 = 23.03, so buy 24 bags of 80-lb concrete. A small job like this is a good fit for bags.

How Many Bags of Concrete Do I Need?

Divide your total cubic feet by the yield of one bag, then round up to the next whole bag. Yields below are typical for brands like Quikrete and Sakrete. Check the label, since yields vary by product.

Bag SizeApprox. Yield per BagBags per Cubic FootBags per Cubic Yard
40 lb0.30 ft³3.3390
60 lb0.45 ft³2.2260
80 lb0.60 ft³1.6745

Bags vs. Ready-Mix: Which Makes Sense?

  • Use bagged concrete for pours under about 1 cubic yard: post holes, columns, small pads, and spots a truck can’t reach. Even 45 bags means lifting and mixing 3,600 lb by hand.
  • Use ready-mix for most pours over 1–2 cubic yards. The patio in Example 1 would take about 123 bags of 80-lb concrete, nearly 5 tons. A truck delivers a consistent mix in one continuous pour, with no cold joints between batches.
  • Ask about short-load fees. A concrete truck typically carries 8–10 yd³. Many suppliers add a fee for orders below their minimum, which varies by region. Get a quote before you assume bags are cheaper.

Recommended Concrete Thickness by Project

ProjectTypical ThicknessTypical Strength
Sidewalk4 in (10 cm)2,500–3,000 PSI
Patio4 in (10 cm)2,500–3,000 PSI
Shed foundation4 in; 4–6 in for heavy sheds2,500–3,000 PSI
Driveway (passenger cars)4–5 in (10–13 cm)3,000–4,000 PSI
Driveway (trucks, RVs)5–6 in (13–15 cm)4,000 PSI
Garage floor4–6 in (10–15 cm)3,000–4,000 PSI
Hot tub pad4–6 in (10–15 cm)3,000 PSI
Footing (house or garage)6–12 in thick, 12–24 in wide2,500–3,000 PSI
Stem wall / foundation wall6–8 in thick2,500–3,000 PSI

Footings must sit below your local frost line, which ranges from a few inches in the South to several feet in northern states. Rebar and wire mesh add strength but don’t displace enough concrete to subtract from your estimate.

Note: These are common starting points, not requirements. Your local building code, permit office, and a structural engineer have the final say, especially for footings and walls.

How Much Extra Concrete Should You Order?

Plan on 5–10% extra for most jobs. Subgrades are never perfectly flat, forms bow slightly under load, and some concrete always ends up spilled or stuck in the wheelbarrow.

  • 5%: Formed slabs on a compacted, screeded gravel base, with forms checked by string line.
  • 10%: The default for most patios, driveways, sidewalks, and walls.
  • 15–20%: Footings dug in soil, over-excavated trenches, hand-dug holes, rocky ground, and pumped pours, since the pump line holds concrete.

Running short costs far more than a little leftover. A second truck means another delivery charge, maybe another short-load fee, and a cold joint where fresh concrete meets the half-set pour. Have a spot ready for extra, like a form for a stepping stone or splash block.

Tips for an Accurate Estimate

  1. Measure depth in several spots. Check the corners and the middle, then use the average. A patio that runs just ½ in deeper than planned across 20 × 10 ft needs about 0.3 yd³ more.
  2. Watch for nominal lumber sizes. A 2×4 is really 3½ in tall, and a 2×6 is 5½ in. If your forms set the slab thickness, enter the real height.
  3. Prep the base, then measure. Compact your gravel base first. Measure from the top of the base to the top of the forms, not from the original dirt.
  4. Account for slopes. If the ground slopes but the slab finishes level, the depth changes across the pour. Measure both ends and average them.
  5. Break odd shapes into pieces. Split L-shaped slabs into rectangles and run each one. Calculate thickened slab edges separately, like a footing.
  6. Keep units straight. Use the unit selectors instead of typing inches into a feet box. Six inches is 0.5 ft, not 0.6 ft.
  7. Round up when you order. Most suppliers sell in quarter- or half-yard steps, so round up to the next increment they offer.

Frequently Asked Questions

How much concrete do I need for a 10×10 slab?

A 10 × 10 ft slab at 4 in thick needs 1.23 cubic yards (33.3 ft³). Add 10% for waste and you need about 1.36 yd³, which most suppliers round to 1.5 yd³. If you’re using bags, that’s about 62 bags of 80-lb concrete. At 6 in thick, plan on roughly 2 yd³.

How many 80 lb bags of concrete make a yard?

It takes about 45 bags of 80-lb concrete to make one cubic yard. Each bag yields roughly 0.60 ft³, and a cubic yard holds 27 ft³. For 60-lb bags, plan on about 60 bags; for 40-lb bags, about 90. Check the label, because yield varies slightly by brand and mix.

How many square feet does a yard of concrete cover?

One cubic yard of concrete covers about 81 sq ft at 4 in thick. It covers about 92 sq ft at 3½ in, 65 sq ft at 5 in, and 54 sq ft at 6 in. For any thickness, divide 324 by the thickness in inches to get the coverage in square feet.

How thick should a concrete driveway be?

A residential driveway should be at least 4 in thick for passenger cars. Go 5–6 in if you park pickups, RVs, or expect heavy delivery trucks. Pair that thickness with a well-compacted gravel base and 3,000–4,000 PSI concrete, and check your local code before you pour.

How do I calculate concrete for a post hole or round column?

Multiply π (3.1416) by the radius squared, then by the depth, with all measurements in feet. Divide by 27 for cubic yards. A 12 in diameter hole 4 ft deep holds 3.14 ft³, or about 0.12 yd³. Dug holes often flare at the bottom, so add 15–20% extra.

How much does a yard of concrete weigh?

A cubic yard of normal-weight concrete weighs about 4,000 lb (roughly 1,800 kg), or about 145–150 lb per cubic foot. That weight matters if you plan to haul concrete yourself. Check your truck’s or trailer’s payload rating before you load up, and never exceed it.

Is it cheaper to use bagged concrete or ready-mix?

Bagged concrete is usually the better deal for pours under about 1 cubic yard, while ready-mix usually wins above that. Prices vary widely by region, so get local quotes. Compare bag costs plus mixer rental and labor against the ready-mix price, including delivery and any short-load fee.

How long does concrete take to cure?

Most concrete can handle foot traffic after 24–48 hours and passenger cars after about 7 days. It reaches its design strength, such as 3,000 PSI, at about 28 days. Keep the surface moist or use a curing compound for the first week, especially in hot, dry, or windy weather.

Get the Right Amount the First Time

Measure carefully, choose the right thickness, and let the concrete volume calculator handle the math. Round your order up, have a plan for any leftover concrete, and you’ll finish your pour without waiting on a second truck.